Week 4
The aim of week 4 The main task of this week is to connect the capacitors bank in series with the load components hence can be used to correct the power factor. The second objective is to test the programme complied in the ARM MCU of which the main functions was to detect the phase difference and to control the capacitors bank. Experiment procedures In the morning section, the main activity was to connect the capacitors bank in series with the load inductors. By converting the phase differences between the voltage and the current to the power factor, the required capacitance to correct the power factor can be calculated. Then the ARM MCU can give the active low signals to the certain branches of the capacitors which can then be enabled to compensate the power factor. Figure 1. Test of the relay module Trouble Shooting The first problem encountered in this week was that the measured power factor using the oscilloscope was much higher than the calculated power fa...